Temporary Staff Accomodation
Minehead, January 2023
For this project, the client was looking to utilise an area of vacant land to create a temporary village to house staff. They had purchased 100 no. site accommodation containers and 3 no. common room units that had to be installed to create a village. We were contracted in to prepare the ground, install services to each unit, surfacing of footpaths, and landscaping. We were asked to act as principal contractor for this project.
-
Survey site and report to the client.
-
Assist with the design and layout of the units.
-
Assist with the design and layout of utility services.
-
Create a bill of quantities for the scope of works.
-
Provide a quotation for the work from the bill of quantities.
-
Act as project manager for the project.
-
Level and grade site.
-
Set out the location of the containers, and each concrete pad for their legs to sit on.
-
Set out for all foul and surface water drainage.
-
Install drainage, electric cables, water pipe and fibre optic ducting.
-
Arrange crane lift to lift containers in to place and assist with lifting operations.
-
Manage other trades and contractors to connect utilities.
-
Surface asphalt footways.
-
Landscaping of grass areas and wildflower gardens.