Studio 36 - Phase 2
Minehead, January 2024
After constructing the temporary venue in 2021, the client wanted to make the venue a permanent structure. We were contracted in to carry out the groundwork element for this project, which involved the installation of an additional attenuation tank for surface water, foul water drainage for a new toilet block, installation of cable troughs throughout the venue, and a 2500 m² reinforced concrete floor slab.
-
Setting out of all drainage and cable troughs.
-
Install a new 700 m³ attenuation tank.
-
Install foul drainage for toilet block.
-
Install approx. 350 linear metres of cable troughs.
-
Install formwork for concrete floor slab.
-
Install steel reinforcing mesh for floor slab.
-
Cast 2500 m² concrete floor slab with power float finish.
-
Form new concrete, asphalt and gravel footpaths to perimeter of venue.